Klient: aPriori, Inc.
Format: Whitepaper
Größe: 3,52 MB
Sprache: Englisch
Datum: 13.11.2018

Staying on track - A guide to managing costs and optimising Time-To-Market

Time is money – especially when it comes to delivering products to market. This means engineering and manufacturing teams operate under constant pressure to ensure that new product introduction process runs on schedule. Design engineers, however, can inadvertently delay the process when working in CAD if they lack full visibility of the impact of any changes they make: even minor changes to the design can affect the cost and manufacturability of a product. This is often not discovered until much later down the line, which can result in excessive late-stage changes and delay time to market.

To address the issue, this paper looks at how utilising more sophisticated tools for identifying potential cost implications can help design engineers, as well as the wider production team, meet critical deadlines and reduce time-to-market.

Kostenloser Download
Bitte geben Sie Ihre Kontaktdaten ein und klicken Sie auf den Button „Herunterladen“. Sie erhalten dann eine E-Mail mit einem Link zum Herunterladen.
Ich willige ein, dass die B2B Media Group GmbH mit ihren verbundenen Unternehmen und aPriori, Inc. meine Daten zu Marketingzwecken verarbeiten darf, insbesondere für marketingbezogenen Kontaktaufnahmen per E-Mail und Telefon.

Sie können Ihre Einwilligung jederzeit über privacy@b2bmg.com widerrufen (Betreff: aPriori, Inc.). Weitere Informationen finden Sie in den Datenschutzhinweisen.

Datenschutz-/Herunterladebedingungen:

Datum: 1.8.2018

Klient

  • B2B Media Group GmbH, Bahnhofstraße 5, 91245 Simmelsdorf (B2B MG)

Partner

  • aPriori, Inc.
Felder mit * sind Pflichtfelder